Cold Work Checklists
Checklist 42 - Test Run Motors and Equipment (PDF, 120,1 KB)
Checklist 44 - High Voltage (11kV) Electrical Switching (PDF, 170,8 KB)
Checklist 45 - Work Inside Any Confined Space (PDF, 646,0 KB)
Checklist 47 - Removal of Handrails, Gratings, Hatches and Fixed Ladders (PDF, 131,1 KB)
Checklist 48 - Cleaning and Treating Operations Using Hazardous Chemicals (PDF, 156,2 KB)
Checklist 49 - Working With Nitrogen (PDF, 143,8 KB)
Checklist 50 - Working On or Isolation of Emergency or Safety Systems (including IPF checks) (PDF, 277,2 KB)
Checklist 51 - Work at Height (PDF, 107,9 KB)
Checklist 52 - Safe Use of Ladders (PDF, 248,5 KB)
Checklist 53 - Pressure Testing of Plant and Equipment (PDF, 193,6 KB)
Checklist 55 - Erection or Dismantling of Scaffolding (PDF, 507,6 KB)
Checklist 56 - Work Involving the use of Personnel Work Baskets or Man Riding Winches (PDF, 259,9 KB)
Checklist 57 - General Rigging and Lifting Work (other than cranes) (PDF, 98,0 KB)
Checklist 58 - Safe handling of Compressed Gases (PDF, 117,6 KB)
Checklist 59 - Making and Breaking Flanges and Bleeding Down Vessels Containing Hazardous Fluids to Drains or Atmosphere (PDF, 186,3 KB)
Checklist 60 - Entry onto Floating and Fixed Roof Tanks (PDF, 193,2 KB)
Checklist 64 - Working on or near Rotating Equipment or Machinery
Checklist 68 - Working with Asbestos (PDF, 464,0 KB)
Checklist 69 - Insulation (PDF, 122,7 KB)
Checklist 70 - Use of Air or Hydraulic Powered Equipment (PDF, 80,0 KB)
Checklist 71 - Abseiling (PDF, 100,6 KB)
Checklist 76 - Fill or Empty Drums, Transportables and Tankers (PDF, 145,5 KB)
Checklist 77 - Breaking Into Systems Containing Ethyl Mercaptan (PDF, 111,0 KB)
Checklist 80 - Work Inside (Davit) Life Boats (PDF, 190,9 KB)
Checklist 84 - Access to Remote Valve Stations AND Pipeline Crossing Enclosures (PDF, 82,9 KB)
Checklist 85 - Draining of Liquids from Equipment Located in "Machinery Spaces" (PDF, 115,1 KB)
Checklist 86 - Cutting of Pipework (PDF, 145,3 KB)
Checklist 87 - Working on, or Monitoring a Process Control System (PDF, 215,3 KB)
Checklist 88 - Prevention of Dropped Objects from Height (PDF, 194,7 KB)